The team at CAD Surveys is a high performing and dynamic unit. Staff interact with each other on projects to coordinate all processes of a job from site set up to final product.
Worked in Architects & surveying practises before forming his own company in 1998. Here he saw there was an obvious gap in the market for measured surveys in AutoCAD which were practically non-existent at the time.
Peter has worked for CAD Surveys for the last 12 years and has surveyed hundreds of buildings. Peter is a highly skilled draughtsman an 3D modeller.
Lynn deals with all administrative aspects of the business as well as site surveys - when its not too cold!
AT CAD SURVEYS WE ARE ALWAYS COMMITTED TO PROVIDING YOU WITH A QUALITY SERVICE
Chrissie joined CAD Surveys after graduating in product design and started with prior knowledge of all things CAD. She has been on training courses for our new 'Topcon' robotic total station and uses it on a regular basis.
Danny joined CAD Surveys after college where he gained a HND in construction. He has used various total station instruments including Topcon and Nikon but has settled on Trimble, which he is fully conversant with.
Elis joined CAD Surveys in 2016 after graduating in structural engineering. He has brought his 'eye for detail' to the company, acquired from his structural engineering background.
Cliff started working life as an apprentice toolmaker in London, before moving to Kent and eventually becoming a Chief Design Draughtsman. He was later head hunted to save a plastics engineering business, a success now evident as it is now owned by a large U.S. company.
CAD Surveys have developed a strong network of trusted surveyors, engineers & building specialists that can be relied upon to pool resources when the need or challenge arises.